Slide 1

Projects

Our work speaks for itself. No matter what the project is, we deliver quality results each time.

Vintage North Shopping Center

Vintage North is a 9,000-square-foot retail center in Odessa with a striking structural steel frame, a mix of brick, metal panels, wood cladding, and EIFS on the exterior, and eye-catching elevated tower features. The project includes essential site development like utilities, parking lot lighting, curbs, and driveways with drive-thru lanes at both ends. The total contract value is $1.935 million, making it a standout retail destination.


VIEW PROJECT

Fort Stockton FBO

Pecos County Fixed Base Operator or FBO for short is located at the Pecos County Airport 1st established by the U.S. Military Army Air Corps in 1942. After WWII it was turned over to the county of Pecos and only received Minor changes and upgrades until 2022 when Pecos County, JSA Architects and Fletco Construction worked together to modernize and improve the FBO. The original building was completely removed due to age and has since been replaced by an almost 5000 square foot modern facility with conference room, lounges, and vending. It is a respite for wary travelers flying in from all over while refueling or conducting business in Fort Stockton. The overall project took about 1 year to complete and stands to serve the community of Fort Stockton and surrounding areas for decades to come.


VIEW PROJECT

11700 Tower Project

11700 Tower Project is a new 16,425 square foot design build structure for a tenant lease. 4.7 acres were developed with public water, natural gas, septic system and fenced to place this PEMB facility which consists of 3925 square foot of finished/flex office space.


VIEW PROJECT

Yellowhouse & Add

Originally we built this building as a design build lease facility on 12 Acres for CSSC Midland, LLC and a design build lease property, but due to a change in the ownership of the company leasing the facility, it was sold to JKK Properties as a John Deere dealership and was retrofitted while new to accommodate a sales floor and parts warehouse.


VIEW PROJECT

Retail on Pecos Corners

We were selected by the owner to build an 8400 square foot retail center shell on Hwy 285 in Pecos TX. The project consisted of sitework, complete building, parking, landscaping, irrigation, trash enclosure, signage, and site lighting. This project had extensive sitework needed to accommodate the drainage of the nearby Walmart, which ran though the property.


VIEW PROJECT

James Avery, Sherwood Village, San Angelo, TX 

Located Centrally on the northwest corner of FM 1788 and HWY 191 in Midland Texas just five minutes from the Midland International Air & Space Port, the Greatmith Industrial Park is a master planned light industrial development.


VIEW PROJECT

12012 Jordy

Located Centrally on the northwest corner of FM 1788 and HWY 191 in Midland Texas just five minutes from the Midland International Air & Space Port, the Greatmith Industrial Park is a master planned light industrial development.


VIEW PROJECT

Dyess AFB Visitor Control Center

This project was a bond project for the City of Abilene to accommodate the needs of the growing Dyess base. The original building was less than 700 square feet, built in 1986.


VIEW PROJECT

Pecos Farms

Pecos Farms is a 20 acre development in which we provided complete construction services including complete site sub-grade replacement, underground public water and fire utilities, including a 6,400′ right of way extension and under highway bore, several acre septic systems, water detention and retention ponds, flexible paving roads, to erect two PEMB structures, one CMU/Wood recreational structure and infrastructure for a 200+ person man camp.


VIEW PROJECT



In Progress



Pecos-Barstow-Toyah ISD Multi Family

Comprising of nine remarkable buildings, this $16 million project stands as a testament to our unwavering commitment to excellence in construction. Designed to accommodate the dedicated teaching staff of PBT ISD, this multi-family complex embodies comfort, convenience, and modernity. As we approach the completion of phase one, we take immense pride in the progress achieved so far. Each building boasts meticulous craftsmanship, thoughtfully tailored to create a harmonious living experience for the educators who shape the future.


VIEW PROJECT

Winkler County Public Library and Office Spaces

The ongoing construction project for the Winkler County Public Library and Office Spaces is progressing impressively. Following the successful completion of the dirt work and foundation phase, the project is now preparing for the steel erecting phase in the upcoming months. The team overseeing the project remains steadfast in its commitment to safety, quality, and community engagement, aiming to deliver a modern facility that will serve the community’s needs for years to come. The support of the Winkler County community is greatly appreciated, and the project looks forward to achieving more milestones as it contributes to a brighter future for the region. Stay tuned for further updates.


VIEW PROJECT

PBT ISD Agricultural Science Barn

The exterior metal building is now taking shape, showcasing the progress and dedication put into this cutting-edge facility. The barn’s construction is marked by exceptional craftsmanship and attention to detail, demonstrating Fletco’s commitment to delivering high-quality projects. Moreover, the insulation phase has been successfully completed, ensuring that the barn is well-equipped to maintain optimal temperatures and provide a comfortable environment for its occupants and livestock. The insulation is strategically installed throughout the structure, further highlighting Fletco’s expertise in integrating functionality and sustainability into their designs.


VIEW PROJECT



Ready to start a project? CONTACT US