Project Manager
Scott Fraser
Superintendent
Ronnie Finley
Plans
Scott Fraser/H3 Design
Tracy Henson
tj@hddwtx.com
432.559.4859
Owner
CSSC Midland, LLC
Blaine Covington
blaine.covington@gmail.com
817.312.4681
11700 Tower Project is a new 16,425 square foot design build structure for a tenant lease. 4.7 acres were developed with public water, natural gas, septic system and fenced to place this PEMB facility which consists of 3925 square foot of finished/flex office space, the shop is 5 ton crane ready and has a built in slab sump with connected sand separators, submersible pumps and a 210bbls ground level water storage tank with concrete retention walls, for gray water. The facility has fire suppression throughout, radiant heat in the shop, a cold-formed steel parapet wall with custom steel awnings.