12012 Jordy

Project Managers 
Scott Fraser/Brett Hazenstab

Superintendent 
Ronnie Finley

Plans
H3 Design

Owner 
CSSC Midland

Completion 
December 2021

12012 Jordy was built as a speculative building in our Greatsmith Industrial Development to be leased. The building consists of 2589 square feet of office, 7500 square feet of heated shop, and 1250 square feet for a wash bay, all fully sprinkled. The building has a TCEQ rated grey water capture system and is structurally built to hold a 5 ton crane.

Dyess AFB Visitor Control Center

Project Managers 
Scott Fraser

Superintendent 
Mike Cross

Plans
Parkhill, Smith & Cooper
340 Beech St. 
Abilene, TX. 79601
325-673-8178

Owner 
City of Abilene
PO BOX 60
Abilene, TX 79604

Completion 
September 2021 

This project was a bond project for the City of Abilene to accommodate the needs of the growing Dyess base. The original building was less than 700 square feet, built in 1986. We demolished the interior and remodeled the existing, plus we attached a 1040 square foot addition with new ADA restrooms, a larger Lobby, waiting room, and ID Counter. We also extended a large concrete parking area with security fencing, landscaping and a large caste stone sitting wall. This project was overseen and inspected by the City of Abilene, but was coordinated with the Dyess AFB as well.

Pecos Farms

This image has an empty alt attribute; its file name is PecosFarms-1-1024x287.jpg

Project Managers 
Scott Fraser | Ronnie Finley

Superintendent 
Izzy Valenzuela 

Architect 
RBA Architects
Rick Brown
rbrown@rbaarch.com
405.529.1025

Owner 
Pecos Farms, LLC
Brian Smiley
brian@edgenr.com
512.422.6411

Completion 
September 2020 
14 Months

Pecos Farms is a 20 acre development in which we provided complete construction services including complete site sub-grade replacement, underground public water and fire utilities, including a 6,400′ right of way extension and under highway bore, several acre septic systems, water detention and retention ponds, flexible paving roads, to erect two PEMB structures, one CMU/Wood recreational structure and infrastructure for a 200+ person man camp. Gladiator Energy Services’ facility is 24,360 square feet of PEMB shop with a 3,240 square foot office build out. The shop was designed to hold up the largest coil tubing units on the market with their outriggers out. Iron Clad Energy’s facility is similarly structured to their sister company and consists of 10,456 square feet of PEMB shop with a conventional 2,200 square foot office build out. The recreation building is a 2,700 square foot CMU/ Wood workout and laundry facility where the site manager’s office is located. We poured 3,434 cubic yards of concrete with 162 tons of rebar, 10,400 8″ and 3,135 12″ CMU blocks, as well as 12,750 square feet of wood decking to complete this project.